top of page

AEL PROJECT

Northpark Drive East Project

logo.PNG

Transportation

Lake Houston Redevelopment Authority/TIRZ 10 (LHRA) will be reconstructing Northpark Drive from approximately 750 feet east of Russell Palmer Rd to approximately 800 feet east of Woodland Hills Dr (1.0 miles in length).


The current four-lane boulevard will be expanded to six lane boulevard with a six-lane grade separation bridge over the Kingwood Diversion Ditch. In addition, new storm sewer systems will be constructed: From Kingwood Diversion Ditch (G103- 38-00) to approximately 800 feet east of Woodland Hills Dr.


AEL will provide engineering services required for the preparation of plans, specifications and estimates (PS&E) and related documents for the reconstruction of Northpark Drive. These services shall include preparing roadway and bridge design, hydrologic and hydraulic design, traffic signal design, supplemental survey and geotechnical data collection. The plans will be developed based on the latest version of TxDOT design criteria, standards and specifications.

Client: HNTB Corporation

Location: Kingwood, Texas 77339

Northpark Drive East.png