Westpark Tollway Phase 2 | AGHA ENGINEERING
top of page

AEL PROJECT

Westpark Tollway Phase 2 (Sub to Dannenbaum)

logo.PNG

Drainage Improvements and PS&E

Client: City of Houston

  • AEL provided design to Dannenbaum Engineering. Dannenbaum was contracted by HCTRA in the preparation of a PS&E package for Ranch Boulevard extending to FM 359 into the city of Fulshear. The current end of the Tollway is at SH-99. The proposed design would extend that out to FM 359 in the City of Fulshear with a 6-lane grade-separated highway and one-way curb and gutter frontage roads with storm sewers. Some of the design services provided include; Roadway Geometric Design, Intersection Grading, Pavement Design, Drainage Design including curb and gutter with stormwater, Signing and Pavement Markings, Traffic Control Plans, Storm Water Pollution Prevention Plans, Utility Relocation Plans, Specifications, Qualities, Cost Estimate, and Construction Request for Clarifications. 

Location: Houston, Tx

Westpark picture.PNG
bottom of page